Sabanci Group
- Letter From The Chairman and The Chief Executive Officer
- Sabanci Group In Brief
- Milestones
- Board of Directors, SBU Presidents and Corporate Management
- Vision and Mission Statement
- Management Approach
- Management Platforms
- Code of Business Ethics
- Risk Management
- Principal Subsidaries and Participation Stakes
- Corporate Social Responsibilty
- Environment
- Sabanci Center
- Unforgettables
| Sabanci Center |
Special features of the project
- 39-floor Akbank Headquarters tower
- 34-floor Sabancı Holding tower
- Conference Center have capacity up to 638 people
- Three multi-use and audio-visual meeting rooms (up to 150+70+70) separated by portable partitions
- Sabancı Holding and Akbank Headquarter towers also have 7 meeting rooms. One of the meeting rooms has video conference system
- Restaurants and cafeterias are capable of serving 2,500 people
- VIP dining rooms
- Breakfast and café service during day
- Emergency ambulance service between 07:30 - 19:00 Monday - Saturday
- Photocopy service
- Branch bank
- Dry cleaning service
- Branch post office
- Branch "Vista" travel agency office
- 440-vehicle open and 36 vehicle closed car park
- A total of 24 elevators in the towers, including two fire and eight express elevators
- A fire warning, prevention, and intervention system that is compliance with international standards
- An energy distribution system which permits flexible office set - up and design
- Electrically commanded and controlled air-conditioning, and elevators
- Electronic security and prevention systems that meet international standards
- Modern, computer-aided building management
- Centralized clock system
- Card-controlled entrance and exit system
- Sound, music, and individual location public address system
- Inter floor document delivery via pneumatic tubes
- Satellite and radio broadcasting
- Economic energy use
- Construction type: Concrete
- Construction site area: 20.475 m2
- Total construction area: 107.000 m2
- Construction height -/+ 0.00 nominal spot height: 157.32 m
- Excavation: 250.000 m2
- Pile retaining wall: 8.350 m2
- Molds (neo-mold system): 250.000 m2
- Reinforcing rods: 10.000 ton
- Concrete: 70.000 m3
- Water proofing: 27.000 m2
- Foundations: 18.000 m3
- Aluminum: 150 ton
- Glass: 25.000 m2
- Granite: 16.000 m2
- Cooling System: 7.800 kw
- Heating System: 5000 kw
- Air-conditioning: 1.378.000 m3/hr
- Electrical energy: 11.200 kVA
- Emergency electrical energy: 7.000 kVA
(10-15 seconds start-up interval) - Continual power source (10 minute loading): 1.500 kVA
- Concrete Standards: BS 30 (350 kgf/ cm2)




